Clifton Terrace Carpark, Wellington, 2006

This project involved installing a manhole over the main interceptor sewer for Wellington. Due to limited access and the depth of the sewer this contract involved digging a 1.8m diameter shaft, 20m deep by hand through rock.

This project won the NZ Contractors’ Federation Wellington/Wairarapa Branch and National awards.