Ward St Wastewater Upgrade Stage 1, 2017

This project consisted of the supply and installation of approximately 560m of 375mm dia. uPVC SN16 sewer main by open trenching and the supply and installation of 1350mm diameter manholes with drop structures and 1200mm diameter manholes.

The trenches were up to depths of 3.5m and needed to be fully shored at all times.

The location of this project was on a main arterial route from Whiteman’s Valley, was located near a train station and also went past a large secondary school and rest home. At 9am and 3pm traffic was incredibly heavy and needed to be managed accordingly.

This project was achieved with the timeframe and within budget.